Project description:

Project activities were comprised of:

  • Design, implementation and continuous operation of the geothermal heat transfer system to validate the heat exchange model, the heat exchanger maintenance and water treatment costs, while demonstrating safe operation and regulatory compliance.
  • Validation of the thermodynamic, energy production and economic modeling to illustrate cost-competitive geothermal energy generation.
  • Design, construction and operation of a 5-7 MW geothermal co-production power plant.